Document Issue Correspondence
Use Case
While adding issue details, the superintendent receives revised drawings and specs from the owner for the additional steel work. He includes these documents with the issue details.
The superintendent also asks his field engineer to send an additional RFI to clarify aspects of the design.
In InEight Change, you can link related documentation (e.g., specs, drawings) under the issue’s Supporting Documents tab. You can also link RFIs to the issue that were created in InEight Document.
The following steps walk through a couple of examples showing how to link documents from InEight Document to your issue in InEight Change, under the Supporting Documents tab.
Example 1: Linking a drawing to the issue
Example 2: Linking an RFI to an issue
Access the following link to learn more: